In the first few lessons, we are roughly learning how to do space planning of a floor in a building. Issues on dimensions, space constrains, emergency route and code of practices have to be included in the planning. So, below are the steps we need to do for space planning.
1st step: Draw a table of index to show the requirements and specify the factors to be included. Example, facilities, lighting and sanitary appliances.
2nd step: Do Work Breakdown Structure (WBS) to simplify the tasks needed to be done.
3rd step: Do Cost Analysis to find out total cost needed.
4th step: Do Activity on node (AON) to find out the duration of the project.
5th step: Do a Gentt Chart to have a schedule for the project and DONE !
thanks ~ bye .